Power BI development and Customer portal, PART 3

Testing is always a crucial part of any Power BI development. When developing content to be embedded there are some different test angles to consider like what type of test users are needed, how RLS works in UI or what might look different after embedding. Testing is also something that needs to be done after go live and you need to have clear understanding with other stakeholders about the production release process.

In my blog series part 1 I described some experiences from my embed projects and issues to consider, like how to identify restrictions in Power BI to meet customer brand and functionalities not supported when content is embedded, to be prepared to manage expectations and agree what areas in the solution are developed with Power BI. The part 2 was dedicated to describe collaboration with stakeholders. This last part includes my experiences from testing and some production use considerations.

 

Testing, testing, testing

I am always a bit surprised how much time testing takes. When developed content to be embedded, noticed that I needed to reserve even more time for testing because testing need to be done in three different places:

  1. Power BI desktop: data validation, functionalities, layout, performance (use also DAX Studio)
  2. Power BI Service: gateway (if needed) and connections, monitor data refresh, Service principal access rights
  3. UI/customer portal DEV and/or TEST environments: Same kind of testing needed as in Desktop as you might find some differences in positions or how e.g Header Icons are positioned or if there appear scroll bars need to be removed etc. If your solution will have a lot of users, then one big part of the testing is performance and load testing. Testing just mentioned requires other stakeholders input.

In “traditional” Power BI development you would do testing in the Desktop and then in the Power BI Service and maybe a bit less time is needed.

Noticed that testing needs to be done using different test users with different access rights. I asked for the different type test users and this way was able to make documentation including the information which features, reports and data each user should see. So, ensure you have all needed test users available to test different use cases. 

As in traditional Power BI content development I needed to test the reports thoroughly to ensure that they work correctly and meet the user’s and brand requirements. In my projects I was able to use real production data, but of course sample test data can be used as well. With my test users I was able to simulate different scenarios and test the report’s performance under different conditions. And of course customer testers were also doing their part in the testing.

 

RLS testing

In my experience one of the most time consuming testing was access/visibility. Row Level Security (RLS) setup needs special attention and needs to be tested first in the Desktop and after this with many different users in the UI. This type of testing is different from the traditional Power BI Service testing/functionalities.

I also experienced that in these type solutions the RLS needs seem to change during the project. And as needs changed, I needed to do testing again for something that was already once approved.

 

Ways of working in testing

In my projects the Test manager/coordinator  enabled a more effective adoption of testing practices. For Power BI developers working together with a Test manager/coordinator will probably mean that you are able to concentrate more on development and changes rather than sitting in testing sessions. Ensure that you have smooth communication with the Test manager/coordinator. Also consume time to show how testing should be done and what is relevant for you in test findings/notes.

Would say that consider carefully if it is useful to let the Testers do testing in Power BI Service. End user experience will not be the same in UI and testers might report wrong results. In my experience the better approach was to enable in the project a testing UI environment as soon as possible. And it is also important to get the Testers to do testing during the development phase and not just at the end of the project. This way I was able to get feedback from the tester in the early phase of the report development.

I noticed that the change and correction need to be reported in a structured way. This way I was able to see the “big picture” and plan the order and the time of the changes with other Power BI developers and UI developers.  So, ensure to use clear versioning practicalities and communication channels. Otherwise you might end-up in a situation where another developer is overwriting a version and some changes are lost. The Deployment Pipeline feature could help to monitor the situation (and coming Git integration within Fabric might give even better results).

 

Experiences during the testing

Gathered some of my experiences from testing in my projects. Maybe these help you to tackle some obstacles beforehand. 

Testing was divided into three areas: data validation, visual layout and Power BI functionalities and UI related report functionalities. I spent most of my time doing data validation like investigating source transactions and exception handling with DAX and testing different DAX solutions to meet business calculation requirements. Also gathering business logic for the calculations from different business and data owners took time.

During report development and testing, the Business owners realized there are more requirements to restrict data visibility to different types of users. RLS definitions changed many times and caused more development work and re-testing.

Noticed that the Testers needed some time to learn how testing is done and especially how to report findings. Learned that it was a good practice to have testing findings in small / many tickets rather than one huge one.

Sometimes the Testers forgot the scope of the project. So, I needed to actively ask the Business owner and Project manager what findings will be fixed and what can be added to future development lists.

The Test manager/coordinator checked frequently with the Testers and Business owner the status of test findings. We also had weekly sessions to check with the Business owner the situation and this way minimized risk of misunderstandings. Would recommend this type of way of working.

Before the Testers started the testing of a new report, we had a demo session. This way I was able to demo Power BI features/functionalities they were not so familiar with. In my experience this type of session is good to have also in the beginning of UAT testing.

Last learning for me was that having a UX Designer in the project helped to notice mistakes in layouts, colors, fonts etc.

 

Performance and load testing

One big part of testing might be performance testing and load testing. In many cases your reports probably work ok and the memory and CPU available within Premium capacity is enough. But if embed project reports are used by many users (thousands), data amounts are large, there are complex calculations and/or many visuals on one report page, you need to start planning the performance and load testing. Questions to the Business owner

  • How many users will there be?
  • Are there some peak moments when there are many concurrent users?
  • How much history data is needed on the reports?
  • Is it possible to reduce the amount of visuals in a report page?
  • Could you provide detailed level information about the business logic calculation needs?

The Business owner might not be able to answer these questions right away, but if you have heard any hints that some of the previous issues are relevant, it is best to include  the performance and load testing to the project.

   

Production use considerations

As in all projects, you need to plan go live tasks and times. In my experience in these types of projects, it is worth considering phased production use start or if a certain pilot user group could be used. This way both customer and development team can get new improvement proposals from new users before a wide audience starts to use the reports.

You also need to discuss with the Business owner and Power BI Admin who is taking the ownership of support and alerts. If you are using e.g., dev, test and prod, maybe the support can be divided like this:

  • First hand support for end-users, inhouse or outsourced support team takes care
    • Support requests like user right problems
    • Owner of prod environment
    • Probably there is a separate tool in use within the customer to handle support tickets
  • “Deeper level” support where support team can contact Power BI developers
    • Support request requiring deep understanding about Power BI development, model, source tables etc.
    • Owner of dev and test environments
    • Probably you have your own organization support ticket tool

This is just one proposal and companies might have very different support models.

 

Testing in production

Another angle in production use is testing the changes and corrections. Remember to agree how future development and release is done. Consider following:

  • What is the timetable for releases?
  • Who is involved in testing? How do testers report results?
  • Where, how and who should be informed about the new features, reports, error corrections etc.?
  • How are changes documented?

Noticed that the planning of production use required many parties and many sessions. My role was more to give insights about the technical possibilities but my Project managers, Power BI admins and Business owners were dealing with other stuff like agreements.
 

Key takeaways

We were able to resolve complicated RLS needs where the authentication tool was not Microsoft Azure AD. This proved that Power BI is a suitable product to be used in solutions where the goal is to embed reports to your customer portal.  

With ensuring enough time for testing these type of projects succeed.

Most important key takeaway was to understand how collaboration with other stakeholders ensures the best end results. Having a team around you with many skills, helps to resolve problems. Luckily in my company I was able to work with different kinds of talented people. 

Lastly, I want to mention the latest news from Microsoft. They launched Fabric just recently and found this exciting blog telling how it is impacting to Power BI Embedded Power BI Embedded with Microsoft Fabric | Microsoft Power BI Blog | Microsoft Power BI

Peoples hands

Power BI development and Customer portal, PART 2

Development work for a customer portal is not something you can do alone. You need a project team with many skills to achieve the best result. When Power BI content is developed to be embedded, you need to collaborate with Power Service or UX designer, BI admin, Software developer, Business owner, Solution architect, Data Engineer, Project manager and Test manager.

In my blog series part 1  I described some experiences from my embed projects and issues to consider like how to identify restrictions in Power BI to meet customer brand and functionalities not supported when content is embedded, to be prepared to manage expectations and agree on what areas in the solution are developed with Power BI.  This second part I dedicated to collaboration as I see it being one of the most important areas in a project where Power BI reports are embedded in a customer portal.

Tight collaboration with stakeholders

This type of development work is not done by individuals. You need to collaborate tightly with different stakeholders. Collaboration with different stakeholders can be very intensive in different phases of the project.

For example, with a UX designer, you need to use more time at the beginning of the project to plan and test layouts, json file etc. Later you will need her/his advice or opinions randomly in smaller details occurring in agile development work of individual reports. And then for example with Power BI admin your collaboration is tight in the beginning to get all accesses, connections etc. and then again at the end of the project when planning go-live and support processes.

How to make use of Service/UX designers expertise and feedback

Make sure you understand Service/UX designers’ drafts (if available) and ensure these issues are discussed:

  • Discuss with her/him about possible problems you recognize, like some planned layout plans are hard to accomplish in Power BI.
  • If a customer portal will be used via mobile phone, check and test together what is possible and what might be hard to achieve within Power BI.
  • Together test in Power BI different solutions to meet the brand requirements, but keep in mind also the usability and accessibility point of view.
  • Together use the time to create a json -theme file and test the import.

During the agile report development, I collaborated with Service/UX designer to get feedback or suggestions to resolve smaller problems in visual positions, sizes or text sizes. After I had published a report for testing, the Service/UX designer looked at it “with fresh eyes” and usually noticed something I had missed. 

What insight you need from Power BI admin

Ask from customer Power BI admin the options and possible boundaries, like

  • How are they using Power BI Service?
  • What license model is in use?
  • Who can create gateway connections if needed?
  • Who can create Workspaces?
  • Does the customer allow custom visuals?
  • Is it ok to use the deployment pipeline process?
  • Will there be a dedicated premium tenant available?
  • Where should backup .pbit files be stored?

Overall make sure you inform the Power BI admin about the progress of the development and ask for help well in advance. I also included my Solution Architect in these discussions.

In the end part of the project, I involved the Power BI admin to plan and decide on go-live tasks and support processes.

 

How to pair work with Software Developer

As Power BI content, report page/pages or individual visuals will be embedded in a UI/customer portal you need to test and try different solutions together with Software developers doing the embedding. Consider these:

  • Clearly communicate the requirements for the Power BI embedded report to the software designer. Discuss the design and branding requirements, as well as any technical specifications, such as data sources and performance requirements.
  • Agree on the storage location for Power BI reports and visual’s IDs and ensure a clear communication process of updates.
  • Check how the report page fits into the UI and what is the best Page View option to be used.
  • Ensure you use the correct canvas size according to brand, but also verify that it is the best from the point of view of the report users.
  • Decide what areas are implemented in UI and what in Power BI. For example, a report header might be easier to maintain on the UI side if changes occur, Power BI page/sheet names need to be hidden in UI or some pre-selections in a date range are easier to do in UI.
  • If a customer portal will be used via mobile phone, check and test together the best Mobile layout for each report.
  • Review the report with the software designer and iterate based on testers’ feedback, both the technical and design aspects of the report.

During the testing phase, I noticed that sometimes for testers it was hard to recognize if the “bug” was related to Power BI or to UI. It helped to have weekly sessions with Business owner and testers. With the Software designer, I was able to smoothly discuss these in our daily sessions and/or in other communications tools.

 

How to ensure communication flow with Business owner

With the Business owner ensure the following:

  • You both understand report requirements and specifications are clear.
  • Reserve enough time and sessions with the customer to explore the old solution/customer portal. 
  • Show the first draft of the new report version in the early phase to get feedback.
  • Ensure to have a communication channel open to ask questions and clarifications. Many times business owners forget to tell all the needed functionalities and during the development, you need to get more insights.

In my experience, it was a good practice to have the demo sessions for each report during the whole development phase in the project. In the testing phase, weekly sessions with the Business owner helped to keep track of the test results, “bug” reports and corrections.

 

Keep in mind other stakeholders

Some stakeholder cooperation is quite typical in all reporting-related development projects, so just briefly mentioning these:

  • Make sure you have a solid communication channel with the Customers data owner/developer, who understands the database, data source structure and business logic. If you are able to utilize a data warehouse, you have more possibilities to discuss with e.g., the Data Engineer which calculation could be done there or what to include in the source views.
  • If an old customer portal exists make sure you have contact persons to investigate and ask about the calculations logic done with the old tool. Sometimes contact can be a customer internal employee or another vendor’s representative.
  • Make sure to keep the Project manager and Solution architect aware of the technical obstacles you are facing or problems with testing resources.  These stakeholders usually take care of the communication with other stakeholders like the customer’s management or testers.
  • Have recognized two other stakeholders, the Test manager/coordinator and Tester, but explain some insight related to them in the last part of my blog series.

I’ve collaborated with all stakeholders described above in my projects but this is not a complete list. For example, your customer organization model affects the number of stakeholders you need to collaborate with.

 

In the last part of my blog series I will tell you about my experiences in testing and support process planning for this type of solution.

Power BI development and Customer portal, PART 1

Nowadays many companies are providing services where their B2B customers can investigate and monitor their data in a customer portal. Data could be related to purchases, product quality, delivery times, invoices etc. This type of data and content can be provided to the customer portal B2B users with BI tools, one of them Power BI.

Developing content for this type of solution includes several topics to consider as with “traditional” Power BI development to be shared via Power BI Service. First you need to identify user requirements. Then you spend time understanding data and identifying the data sources, the relationships between them, and the types of data your working with. After this you’re able to clean and transform the data to ensure that it is accurate, complete, and consistent. Next you need to design a model that is optimized for performance, scalability, and usability. This involves creating the necessary tables, columns, relationships, hierarchies, and calculations to support your analysis.

When data and data model is ready, you can choose appropriate visualizations, create interactive elements such as drill-downs and filters, optimize the report layout and ensure accessibility. Finally you need to use time to test your model and visualizations to ensure that they are working correctly and meeting requirements. During the whole process you remember to document the report design, data model, and queries used in the report.

Power BI content development to embed

Power BI Premium enables report and visual embedding. In this blog series I will concentrate on the Power BI developer’s point of view on a solution using some parts from Microsoft “Embed for your customers”. These types of solutions allow developers to build an app that uses non-interactive authentication against Power BI. Usually the report users are external users, and they don’t need to sign in using Power BI credentials to view the embedded content.  (If you are interested in learning more details about a software developer’s point of view, visit Microsoft’s official pages Power BI embedded analytics Client APIs | Microsoft Learn.)

In addition to these, there are things that I needed to take into account in the development work or need my special attention. Below are my key takeaways from the Power BI development projects where the objective was to recreate the old customer portal reports. Many of these are applicable also to  Qlik Sense.

  • Identify restrictions in Power BI to meet customer brand or other UX design requirements and contribute to the development of a good theme file (json).
  • Prepare to do some expectation management.
  • Identify functionalities not supported when Power BI content is embedded.
  • Agree features/functionalities development and setups done in Power BI.
  • Do tight collaboration with stakeholders. – Read more in the second part of my blog series.
  • Reserve enough time for testing. – Read more in the third part of my blog series.
  • Remember to plan and agree on the support process well in advance as usually there are several parties and even tools involved. – Read more in the third part of my blog series.

 

Power BI restrictions and UX-related requirements

Some customers’ brands might have colors not best for reports accessibility or a font type not supported by Power BI. To tackle these in my experience the development work is easiest to do with a Service/UX designer and with the person responsible for the brand. So, in the early phase of the development work make sure you  identify restrictions in the tool to meet brand or other UX-related requirements

Contribute to the development of a good theme file (json). This ensures that all reports have consistent and on-brand colors, fonts, etc. Experienced later that when my customer changed brand colors, it was much easier to implement these changes to all reports. Of course, this type of thinking is relevant in “traditional” Power BI development, but when reports are published outside customer organizations, these issues tend to be even more important.

 

Expectation management

Prepare to do some expectation management for the customer and testers, if an old existing customer portal is recreated with a new technology. Not all functionalities of the old implementation can necessarily be implemented or they are implemented in a different way.  Or the new implementation may have new features or some functionality may be better or sometimes worse compared to the old implementation. During my projects this took time as there was existing portal to be replaced. 

To really understand feature and functionality requirements, reserve enough time and sessions with the Business owners or Testers to explore the old solution. In my projects I showed the first draft of the report in the early phase, to get feedback. Noticed also that sometimes the Business owner or Tester do not understand the advantages of an agile way of development. So, it did need some courage to show “not so polished” report versions.

If a totally new customer portal is created, then you probably have much more freedom to introduce visualization types and report layouts/features. But in this case, I would also prefer to demo as soon as possible the first draft version of a report.

Power BI restrictions and embedding

Ensure you know all the solution requirements and discuss them with the Solution Architect and Software developer whether they all are possible to implement. Especially some Power BI Service-related functionalities you probably need to handle outside the tool:

  • Export to PDF
  • Save favorites/bookmarks
  • Report Subscription
  • Hiding reports from certain users
  • Embed report size and positions in the customer portal
  • Functionality to move from one report to another with portal selections/dropdown lists

 

Agree on features/functionalities development and setups done in Power BI

These features/functionalities I needed to agree with other stakeholders if they are developed in or outside Power BI:

  • Report headers/titles (consider where maintenance of the name changes is easiest)
  • Consider if some Filter controls need to be done in the UI/customer portal. E.g., default selections in slicers.

These features/functionalities setups in Power BI need to be agreed upon and tested carefully:

  • The format of token values is managed outside Power BI, but need to make sure that RLS rules use the correct formats
  • Page view setup
  • Page/canvas size, Height and Width
  • Mobile layouts

 

I will continue the story about my own experiences related to tight collaboration with stakeholders, testing and support process planning in the next parts of my blog series.